If you have flash installed you will be able to click play on the video below
Saltdean Lido Follow-up Meeting(s)
1. Introductions and Purpose of the Meeting
Denis Audley
Mark Strawbridge
Welcome and hanks to Saltdean Community Association
for assistance with the organisation of this meeting
2. Contents
Feedback from the first meeting – Clarification
Community Components
Community Centre with Meeting Hall
Library
Retain Listed Building
‘Wish List’ Components
Youth Centre
Indoor Pool
Retain Lido Pool
Children’s Play
Costs – Community Contribution
Scenarios
Original scheme with housing
Minimal scheme
Optimum Scheme
Sketches and Sectional Elevations
3. Feedback from 1st Meeting
Analysis of responses indicated some confusion on a number of points:
The tunnel to the beach and the footpath along the base of the embankment are outside the boundary of the site and would remain unaffected by any development
The ‘shingle’ car park is not strictly a public car park; its use is for the Lido site only.
Flats at the Ocean Grand complex which have been completed have mostly been sold; there are some up for sale a second time
The proposals envisage no loss of community facilities at all
The original listed building is not intended for demolition
Saltdean Tavern is outside the site and is not affected
The café would be restored and retained as part of the overall provision
The new facility in the restored listed building would be fully accessible with a lift
The new library would be nearly twice the size of the existing one
Community Components (Elements key to the scheme overall)
Community Centre with Meeting Hall
Existing c.835sqm (9000sqft) proposed 675sqm(7000sqft)
c.£1.05 million (net of fees etc.)
Library
Existing c. 102sqm(1100sqft) proposed 185sqm(2000sqft)
c.£0.37m
Retained Listed Building
Useable space at present very limited – potential c 650-700sqm
c. £0.9m
Community Centre
Hall
Offices
Store
WCs
Bar/Lounge
Café
Meeting Spaces
Lift
Foyer
Service access
Library
Reading Room
Library Shelving Area
Resource Centre
Information Point
ICT Area
Meeting/Teaching/Event Area
Storage/Secure Store
The Listed Building
Repairs to structure
Repairs to fabric
Refit and render fit for use
Reinstate first floor and sundecks to use
Pools
Replace plant and filtration
Replace heating system
Refinish Pool(s) and surrounds
Reinstate other features
‘Wish List’
Youth Centre - £0.3million
Indoor Pool - £0.45million
Retain Lido Pool(s) – see above
Children’s Play area - £0.04million
Café - £0.15million
More ‘Garden’c. £0.1million
Costs
Community Components £2.32million
Wish List £1.04million
Fees, Costs etc £0.67million
S106 contributions £0.25million
e.g. School Places, Open Space, Transport Plan, Infrastructure levy etc. TOTAL COMMUNITY CONTRIBUTION c. £ 4.28m
Scenarios
Original Scheme with Housing
Minimal Scheme delivering minimum community capital
c. Optimum Scheme delivering the ‘Wish List’
Benefits
State of the Art Library upgrading and extending the existing one.
Brand New, accessible Community facility including Hall and Lift
Carbon neutral construction; Heat Light and Power generated from the site would offset running costs of the community facilities by up to 100%
Retained and refurbished Listed Building
Retained and refurbished Lido pool
New Heated Indoor pool in addition
Improved Health Suite and Health Centre
Employment and year ‘round revenue generation opportunities for the Community
New accessible public open space
With off-site contributions, a total of approximately £4m investment in the community asset